New Concrete Patio Installation in Pittsburgh, PA

Building a patio where there is nothing today means solving the yard first. Slope, access and water come before the pour. Free on-site estimate.

Layout Staked Before Digging
Base Built For Clay Soil
Pitched Away From The House
Serving Allegheny County

What is the first thing that should happen when you decide to put a patio in your backyard?

Not the pour, and not picking a finish. It is standing in the yard working out where the water goes, because in a region this hilly that single answer shapes the size, the shape and the elevation of everything that follows.

Laying Out a Patio That Fits the Yard You Actually Have

Most Pittsburgh lots are not flat. A yard that falls away from the house, or runs across the slope, changes what a patio can be before anyone talks about square footage.

Where the ground drops, the choice is between cutting into the slope and holding it back, or stepping the patio down in levels. Both work. What does not work is a single flat slab floated over a grade that was never resolved.

Height matters just as much. The finished surface should sit low enough to clear the door threshold and the siding, and still leave room to pitch water away. Getting that elevation wrong is the mistake that shows up later as water sitting against the foundation.

What We Work Out Before Quoting a New Patio

A patio quote written without walking the yard is a guess. These are the things that actually decide the scope, and they get settled at the site visit.

Access is the one people underestimate. A backyard reached only through a side gate is a different job from one a truck can back up to, and it is fair to know that before you compare bids.

How a New Patio Gets Built

Nothing here is exotic. It is the ordinary sequence done in the right order, which is what separates a slab that lasts from one that moves in its third winter.

1. Stake the layout and confirm elevations

We mark the footprint on the ground so you can walk it before anything is dug, and we set the finished height at the house. Seeing the real outline in the yard changes people’s minds about size more often than any drawing does.

2. Call in utility marking, then excavate

Locates come first. Then we dig out topsoil and any soft material down to solid subgrade, because organic soil left under a slab keeps compressing long after the concrete has cured.

3. Build and compact the base

Crushed aggregate goes down in lifts and each one gets compacted rather than the whole depth at once. Where clay is heavy, geotextile fabric between the soil and the stone keeps the two from mixing over time.

4. Form, reinforce and set the pitch

Forms are set to the pitch the yard needs, and reinforcement goes in positioned within the slab rather than lying on the base. The fall is built into the forms at this stage, not chased afterward.

5. Pour, finish, cut joints and cure

An air-entrained mix goes down, gets finished to the texture you chose, and control joints are cut to depth on a planned spacing. Curing is managed rather than left to the weather, which is where a lot of surface problems begin.

Sizing a Patio You Will Actually Use

The most common regret we hear is that a patio came out too small. A table with chairs pulled back needs more room than people picture, and a grill area needs clearance that is not shared with a walkway.

The second most common is a patio that never gets used because it sits in full afternoon sun with no shade, or catches every gust that comes across an open yard. Orientation is worth thinking about before the footprint is fixed.

It is also worth deciding early whether a cover, a fire feature or a future extension is on the cards. Planning the slab and the drainage around that now is straightforward, whereas adding footings under a finished patio later is not.

New Patio Installation Across the Pittsburgh Area

We build new concrete patios throughout the city and the surrounding communities, including Squirrel Hill, Point Breeze, Highland Park, Regent Square, Brookline, Greenfield, Mt. Lebanon, Upper St. Clair, Bethel Park, Peters Township, McMurray, Ross Township, McCandless, Wexford and Franklin Park.

Sloped lots through the South Hills and hillside neighborhoods usually need grading or a low wall worked into the design. Newer developments around Cranberry Township, Marshall Township and Gibsonia are flatter, but they sit on engineered fill, so base compaction carries more weight there than people expect.

New Patio Installation FAQs

Most residential patios run a few working days on site across excavation, base, forms and the pour. Curing continues after the crew leaves. Slope work, retaining walls or difficult access extend it, and you get a schedule with the estimate.

Light foot traffic is usually fine within a couple of days, and furniture after about a week, though concrete keeps gaining strength for far longer. We give you specific timelines for your pour rather than a general rule.

It depends on your municipality and on whether the patio is at grade. Zoning setbacks and impervious surface limits come up more often than building permits do. We confirm what your township or borough requires as part of scoping the work.

Late spring through early fall is the reliable window. Concrete needs consistent temperatures above roughly 50 degrees to cure properly, and it needs that for several days rather than one, so the schedule tightens once nights start dropping.

Concrete moves, so control joints are cut to give it a planned place to crack rather than a random one. Proper joint spacing, reinforcement and a compacted base are what keep that movement invisible instead of structural.

Yes, and most Pittsburgh backyards need some version of it. The options are cutting into the slope with a retaining wall, stepping the patio down in levels, or building up on one side. Which one suits depends on how much fall there is.

Get Your New Patio Priced Properly

Send a photo of the yard and roughly where you picture the patio sitting. We will walk the grade, work out where the water needs to go, and put a scope in writing before anything is scheduled.