Home  /  Concrete Patios  /  Covered Patios & Additions

Covered Patios and Patio Additions in Pittsburgh, PA

The moment a roof goes over a patio, the slab stops being flatwork and starts carrying a structure. That changes what goes underneath. Free on-site estimate.

Footings Below Frost Depth
Slab Sized For Roof Loads
Permits Confirmed First
Serving Allegheny County

Here is the thing most people do not expect about covered patios. The hard part is not the roof.

It is what happens below ground. A cover puts concentrated point loads through posts into the slab, and those loads have to reach undisturbed soil below the frost line. A patio poured as ordinary flatwork cannot do that, which is why covers added later so often come with problems.

Why a Covered Patio Is Built Differently

An uncovered patio spreads its load evenly across a compacted base. A covered one concentrates the weight of the whole structure into a handful of post locations, and adds whatever snow sits on the roof through a Pittsburgh winter.

Those points need proper footings, poured down past frost depth so the ground freezing and thawing beneath them cannot lift the posts. In this part of Pennsylvania that means going considerably deeper than a slab alone would ever require.

The slab itself usually gets thickened at those bearing points, and reinforcement is planned around them. None of this is visible in the finished patio, which is exactly why it gets skipped by anyone quoting a cover as a bolt-on.

What Gets Settled Before Design Starts

Covered structures touch zoning, drainage and the house itself, so more gets confirmed up front here than on a plain patio.

Attaching to the house is the decision with the most consequences. A ledger fixed into the wall has to be flashed correctly, and getting that wrong puts water behind the siding rather than in front of it.

How a Covered Patio Comes Together

The slab and the structure are one project, planned together. Trying to sequence them as two separate jobs is where most of the avoidable problems come from.

1. Confirm what is allowed on your lot

Setbacks, impervious coverage and permit requirements vary considerably across the municipalities in this county. We establish what your specific borough or township requires before anyone draws a footprint.

2. Locate the posts, then dig the footings

Post positions are set from the design, utilities are marked, and footings are excavated below frost depth to undisturbed soil. This happens before the slab, not after.

3. Pour footings and set anchors

Footings are poured and post anchors set in the wet concrete in their final positions. Anchors drilled into cured concrete afterward are a compromise, and on a structure carrying snow load it is not one worth making.

4. Build the base and pour the slab

Base goes in and gets compacted, the slab is thickened where it needs to be, reinforcement is placed, and the pour is pitched to carry water away from the house even though it will be under cover.

5. Frame, roof and flash

Posts, beams and rafters go up off the anchors, the roof goes on, and where the structure meets the house the flashing is detailed so water is directed out rather than tracking down behind the wall.

Attached or Freestanding, and What Each Costs You

Attached covers give you a continuous space off the back door and usually feel like part of the house. The trade-off is that they involve the building envelope, which means a ledger, flashing, and a permit conversation that is rarely optional.

Freestanding structures avoid touching the house entirely. They are simpler to permit in many municipalities, they can sit wherever the yard actually works best, and they leave your siding and roofline alone.

Where a yard slopes, freestanding often wins on practicality too, because it can be positioned on the flattest ground rather than forced to align with the house. We will lay out both options against your lot and setbacks at the estimate.

Covered Patios Across the Pittsburgh Area

We build covered patios and patio additions throughout the region, including Mt. Lebanon, Upper St. Clair, Bethel Park, Peters Township, McMurray, Bridgeville, Ross Township, McCandless, Wexford, Franklin Park, Marshall Township, Cranberry Township, Sewickley, Fox Chapel, Monroeville, Murrysville and Robinson Township.

Permit handling differs noticeably between the city and the outlying townships, and again between one borough and the next. Newer developments in Cranberry and Marshall also carry homeowner association rules on structures, which is worth checking before design gets far.

Covered Patio FAQs

Almost always, and often two separate approvals covering zoning and building. Adding a roof changes both the impervious surface calculation and the structural picture. Requirements vary widely across Allegheny County, so we confirm yours before design.

Below the local frost depth, into undisturbed soil. In Western Pennsylvania that is substantially deeper than a slab requires. Footings that stop short get lifted by frost heave, which racks the structure over a few winters.

Sometimes, but it depends on what is under the existing slab. Ordinary flatwork usually has no footings at the post locations, so proper footings have to be added, which means cutting into the slab. We assess that before quoting.

Yes. Wind-driven rain reaches under a cover, water gets tracked in, and washing down the surface has to drain somewhere. A covered patio pitched flat or back toward the house holds water against the foundation.

It is designed for, and it is a real factor here rather than a formality. Roof structure, post sizing and footing dimensions all follow from the load the roof has to carry through a Pittsburgh winter.

Yes, provided the footings and anchors go in during the original pour. Planning the structure now and building it later is straightforward. Adding footings under a finished patio afterward is disruptive and avoidable.

Plan the Slab and the Cover Together

Tell us whether you are picturing something attached to the house or freestanding, and send a photo of the yard. We will check your setbacks, lay out post positions, and put the whole scope in writing.